Egypt Zones accountACCOUNT
Amaml Tank Farm Piping Replacement
Maintenance and Repair
Reference 1/2018
Date 1/22/2018
Location Africa
Scope The company announces its need for Amaml Tank Farm Piping Replacement.

Summary of the Work:
• Replace the Amal Tank Farm VEBA (HOO) and AGOCO inlet and discharge piping (20”,30”,36”) on a ‘like for like’ basis using modified Mott Macdonald drawings and scope of work The new scope includes the following additions:
- Piping tie-in connections for future installation of booster
pump suction and discharge piping when sufficient funds
are available to execute this work.
- Replace the 30" and 36" suction headers piping between
the metering area isolation valves and main oil line pump.
- Replace the 36" crossover piping between Tanks 3 & 4.
- Provide methodology and procedures for fluid
recirculation between tank booster pumps and upstream
of the metering area to ensure flow during periods that
the tank farm is off line.

Bidding Information

Bid Bond LD 10,000.00
Offer Validity 180 days
Documents Price LD 1,500.00
Maintenance and Repair
Related Prooducts: Maintenance and Repair Consultants Engineering General Maintenance and Repair Production Engineering Project & Resource Management Training & Education
Related Tenders: Consultancy Engineering FEED General Maintenance and Repair Process Technology Licensing Production Engineering Project & Resource Management

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.