Reference | GT18100400 |
Date | 2/4/2018 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for EPIC for Replacement of Fire Water Network in Old Port Area. "EPIC for Extension of the fire water network to all Old Port Area facilities and RLF-2 Substation via a new ring main from the existing network constructed under the Port Expansion Project (GC07100300). The new fire water network shall be provided for all Old Port Area facilities where presently the fire water is supplied by sea water system and potable water system. In addition, the fire water network shall be provided to the following facilities to improve the plant protection system reliability:- a) New Port Control Tower. b) Common Sulphur Plant. c) RLF2 Substation (near Port Administration Building) The new fire water network shall tie-in with the existing fire water network constructed under Contract GC07100300 at the following locations:- a) Tie-In with the existing 28 inch diameter discharge header from treated industrial water pumping station (RPB 94) at the southern end of RLTO Tank Farm. b) Tie-In with the existing 28 inch diameter end flange near the start of the Liquid Product Causeway. In line with the existing fire water network constructed under Contract GC07100300, treated industrial water shall be used for the new fire hydrant network and sea water shall be back up for treated industrial water. To provide potable water supplies for Fire Hose Reel and Sprinkler Systems to the following buildings:- a) Port Maintenance Workshop b) Port Operation Building c) Old Fire Station No. 1 d) FSO Marine Workshop e) Port Administration Building Provide tapping point with isolation valve near Common Sulphur Plant from new fire hydrant network for future requirement. Decommissioning of existing sea water and potable water fire water systems. |
Bid Bond | QR 2,000,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QR 500.00 |