Scope |
The company announces its need for Complete refurbishment of wash tank D-9 and degassing boot at Beda field.
The maintenance works include internally sludge removing, cleaning, grit blasting, for complete inspection and repairing after the complete repair for the tank and degassing boot as well. The present wash tank is in service since long time and have been maintained temporary since five years. Therefore, it is the AGOCO intention to carry out some repairing and replacement works for the crude wash tank, D-9 and the degassing boot as well according at the AGOCO scope of work and corrosion section inspection report at Beda Oil Field.
|