Reference | BID913778 |
Date | 1/29/2018 |
Location | Africa |
Scope | The company announces its need for Cleaning and Sealing Pavement Cracks at Sarir Airport. Brief Description of the Project: The project is a quick maintenance of the airport bed field, mainly in the milling of the top layer of asphalt and repair of cracks in the oil bed field airport. It is divided into three stages:. Asphalt milling of top layer (4 cm),and cracks repair of the Runway area, asphalt milling (6 cm) and cracks repair of Taxiway area,. asphalt milling ,cracks repair and expansion joints between the concrete pads shall be cleaned & repaired in the apron area. Apply a new asphalt pavement of the airport at full areas (runway, taxiway & apron), apply asphalt paving for shoulders: use the asphalt resulting from milling of the airport pavement to reduce the difference in height between the runway and shoulders, and finally apply new paint marking for new pavement at all airport areas. |
Bid Bond | 0.5% from bid total price |
Bond Validity | 180 days |
Documents Price | LD 500.00 |