Reference | 1000002241 |
Date | 5/29/2018 |
Location | Africa |
Scope | The company plans to carry out Non Destructive Testing and Inspection Services on its offshore exploration, appraisal, and production location(s) in NNPC/MPN JV acreages. Anticipated contract term is two (2) years with an additional one (1) year optional period. Tenderer(s) will be required to provide Non Destructive Testing and Inspection Services. The scope of work shall involve provision of personnel and equipment associated with Non Destructive Testing and Inspection Services but not limited to: tubular handling; visual inspection; Electromagnetic Inspection (EMI); Wet and dry Magnetic Particles Inspection (MPI), Full Length Ultrasonic Inspection (FLUI); wall thickness Ultrasonic Testing (UT) test for plates and membranes, classification of tubing, casing and drill string connections; pressure testing; internal visual inspection of tubular goods (borescope and/or video); welded pad eyes or any load bearing rig weld/fabrication, and others as Company may require. Contractor's inspection services shall include but are not limited to the following NDT inspections: I. New, used, repaired and re-threaded casing and tubing at the Drilling Unit or other Company designated facility when requested by Company. II. Drill string tubular goods at the Drilling Unit or other Company designated facility when requested by Company. Drill string tubular goods shall include, but are not limited to drill pipe, drill collars, drill subs, directional tools and motors, MWD and LWD tools and other items as specified by Company; III. Certain completion accessories such as gravel pack, screens, blanks, subs, completion components and accessories, handling equipment etc. at the Drilling Unit or other Company designated facility when requested by Company. IV. Heavy lifting gear (cranes, top drives, elevators, slips, crown & travelling blocks, crane pedestals & blocks, etc.), hoisting & lifting equipment (slings, shackles, cargo baskets, cargo boxes, etc.), flanges, blinds and any other drilling or rig related equipment at the Drilling Unit or other Company designated facility when requested by Company. V. Welded pad eyes or any load bearing rig weld/fabrication. VI. Wall thickness Ultrasonic Testing (UT) test for plates and membranes. VII. Rope access inspection and inspection at heights. |