Reference | MTC-30/2018 |
Date | 6/19/2018 |
Location | Africa |
Scope | The company announces its need for Hamada Electrical Power System Study Project No O-73. The prime goal with this project is to provide an Engineering Consultancy services in order to enhance the existing Hamada electrical power system vai : - Provide reliable / good quality power to all existing and any developed loads in the system - Update the system (possible obsolete equipment) The production studies (data collection, network analysis, and relay coordination study, setting of all relay protections, create complete network model in the ETAB software, load flow studies of the entire network, fault current studies of the entire network) and the system control is required. |
Documents Price | LD 3,000.00 |