Reference | MTC-05/2018 |
Date | 7/3/2018 |
Location | Africa |
Scope | The company announces its need for Installing 2- phase production separator and three shipping pumps at GC-3. Scope of work: - Preparation details engineering work. - Installation of connection points for separator (liquid/gas) lines with existing pipe. - Supply of spare parts for two years recommended by manufactures. - Inspection of radioactive material during installation for pipes connecting joints. - Supply and installation of a control panel and connect them with test separator and main control room with the supply for cable needed to finish the work. |
Documents Price | LD 2,000.00 |