Reference | HFY-CON/F&C0987-1010 |
Date | 9/10/2018 |
Location | Middle East |
Scope | The company announces its need for Provision of EPCC For CPF1 Upgrade. The main scope of work includes: 1. CPF1 Upgrade. 1.1 CPF1 Crude Oil Processing System Upgrade. 1.2 CPF1 Produced and Fresh Water Treatment Expansion. 1.3 CPF1 Gas Compression System Expansion. 1.4CPF1 Power Plant Fuel Gas Supply System Upgrade. 1.5 Utilities & auxiliary system Upgrade. 1.6 Addition of one Pig Receiver in HPS. 1.7 Operational Improvement. 2. CPF2 Modification. 2.1 CPF2 Gas Compression and Condensate System expansion. 2.2 Addition of Booster Pumps in CPF2 Produced Water Treatment System. 2.3 Addition of one Pig launcher. 2.4 Utilities and Auxiliary System modification 3. Pipelines Re-routing. 3.1 The re-routing of the GEXL and condensate pipeline built in Phase 1. 3.2 A block valve station. |
Documents Price | US 500.00 |