Reference | GT18105400 |
Date | 9/6/2018 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for EPIC for Dukhan Produced Water Transfer Pumps. The objective of the project is to implement FEED services pertaining to facilities/ modifications required under Phase-1A of DPFU, as related to Milestone 1 (Produced Water Transfer pumps). 1. At KS: Additional 1 (ONE) new Produced Water transfer pump with similar capacity and differential head to existing pumps. 2. At FN: Additional 2 (TWO) new Produced Water transfer pumps with similar capacity and differential head to existing pumps. 3. At FM: Additional 1 (ONE) new Produced Water transfer pump with similar capacity and differential head to existing pumps. 4. At FS: Additional 1 (ONE) new Produced Water transfer pump with similar capacity and differential head to existing pumps. 5. At JM: Additional 1 (ONE) new Produced Water transfer pump with similar capacity and differential head to existing pumps. 6. Other recommendations related with replacement/re-trim of existing Control valves in the produced water transfer pumping systems at various degassing stations. 7. Various other recommendations for replacing, modification, and recalibration of several existing flow meters in various degassing stations, and PWI stations. 8. Implementation of process data transfer related to produced water transfer pumps systems at the degassing stations, and respective PWI stations to the DIC. |
Bid Bond | QR 2,000,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QR 500.00 |