Reference | 911 |
Date | 3/6/2019 |
Location | Africa |
Scope | The company announces its need for provision of remediation & reclamation of produced water retention pits at remote Stations (R/ 82, OO, UU And Kk Stations) The bidder is required to survey produced water retention / emergency pits to estimate the quantity of produced water to be emptied and contaminated waste to be re mediated and disposed of in compliance with EGA approved methods and international environmental standards, prior to submitting the proposal. The bidder shall also have compliance testing and analysis program for the remediation and groundwater under and around the retention pits. Reclamation of the retention pits sites will be required by back filling of the excavated pits with re mediated or imported soils from surroundings (imported soil must have lab analysis and be compatible with the surrounding soil in soil quality). |