Egypt Zones accountACCOUNT
Provision of Artificial Lift System (ESP) and Well Testing Services
Logging, Perforating, Testing
Reference BID915564
Date 10/2/2018
Location Africa
Scope The company announces its need for Provision of Artificial Lift System (ESP) and Well Testing Services Erawin Fields (NC200).

The scope of work defined here below pretends to be an exhaustive description of the supplies and services to be provided by the selected contractor(s) for NC-200 ESP operations and well testing services. Specialized ESP contractor(s) are invited to complement the list including any addition deemed relevant. Altogether, services and supplies shall guarantee the good performance of oil producers and water source wells equipped with ESPs, the work shall include all the following actions:-

- Conduct a site survey to assess technical and logistical needs.
- Procurement, Inspection and Testing of Materials.
Provide full set of well Testing Services equipment accordance to technical specifications.
- Provide six (6) sets of Artificial Lift Systems (ESP) with other associated equipment/tools accordance to technical specifications.
- The expected lowest total flow rate will be 4000 bbls/d with range of (200 to 2000) bbls for every well.
- The maximum reservoir temperature °F180 and maximum pressure 1900 psi.
- The maximum total depth for NC-200 oil wells is +/- 4500 ft. with 9 5/8’’ casing and 3 ½’’ tubing.
- The maximum total depth for NC-200 water wells is +/- 6000 ft. 8 ½’’ OH and 5’’ tubing.
- Design and selection of all surface and downhole equipment with specialist assistance installing surface components.
- Specialist assistance making up and running in the hole-pulling out of ESP assemblies.
- Warehouse management program for surface-downhole equipment and consumables (limited number of pump types).
- Implement a continuous improvement program
Train Zallaf staff on design, installation and operation of all surface and downhole equipment, in particular:
Data analysis and pump performance diagnosis, Pump design and equipment selection, Installation and commissioning of downhole and surface equipment, Surface electrical equipment performance monitoring,

Bidding Information

Logging, Perforating, Testing
Related Prooducts: Logging, Perforating, Testing Artificial Lift Cementing, Stimulation Drilling Drilling Engineering & Equipment Systems Enhanced Oil Recovery General Logging, Perforating, Testing Offshore Drilling Reservoir/Completion Consultants Workover & Well Services Workover Rigs/Services
Related Tenders: Artificial Lift Cementing, Stimulation Directional Drilling Drilling Drilling Engineering & Equipment Systems Enhanced Oil Recovery General Logging, Perforating, Testing Offshore Drilling Reservoir/Completion Consultants Workover & Well Services Workover Rigs/Services

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.