Reference | GT18106100 |
Date | 10/29/2018 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for EPIC for New Cooling Water System for NGL 1, 3 & 4. The Scope of Work includes Engineering, Procurement, Installation and Commissioning of New Cooling Water System for NGL-1, 3 and 4 mainly comprising the following facilities: a) Replace three (3) existing Cooling Water Pumps (4,800 m3/hr each) at NGL jetty with three (3) new pumps. b) Replace cement lined carbon steel cooling water header between cooling water pumps and cooling water filters with GRP header. c) Like to like replacement of one (1) cooling water filter. d) Installation of six (6) Chlorine Analyzers on cooling water supply and outfall lines from each of NGL-1, 3 & 4. Part B - EPIC for Boil off Recovery at NGL - Mesaieed: Scope of Work includes Engineering, Procurement, Installation & Co mmissioning of piping, manual isolation valves, check valves Emergency Shut down valves and the Flowmeter. |
Bid Bond | QR 2,000,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QR 500.00 |