Reference | CDC0146P19 |
Date | 12/27/2018 |
Location | Asia |
Scope | The company announces its need for Construction of 1.5 meter high half Brick boundary wall (Approx. Length=460 M) with 1.2 meter High XPM fence along with Concertina coil by replacing the existing b fencing at Madhuting Survey Camp along with patrolling footpath and 2(two) steel of gates. The instruments to be supplied are as follows: - - Item 001 Qty=2300.00 of Jungle cutting and clearing including removal of cut materials up to 100m from site and disposing as directed (all jungle to be cut at ground level). For light jungle including plants and trees up to 300mm girth. - Item 002 Qty=1150.00 of Dismantling woven wire/jingle wire/XPM/IRC fencing with post & rolling, collecting and stacking dismantled material as directed in a place ready for transport. - Item 003 Qty=47.00 of Demolishing cement concrete manually / by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in - charge.1:3:6 or richer mix. - Item 004 Qty=828 of Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil. - Item 005 Qty=138.00 of Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilizing the remaining earth locally for road work.)for Ordinary Soil by Manual Means (Depth up to 3 m) - Item 006 Qty=29 of Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) - Item 007 Qty=8.00 of Laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 ( 1 Cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) - Item 008 Qty=80.00 of Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) - Item 009 Qty=54.00 of Laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) - Item 010 Qty=765.00 of Cent ring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete. - Item 011 Qty=8799.00 of Providing reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. - Item 012 Qty=2069.00 of 12mm cement plaster of mix:1:4 (1 cement : 4 coarse sand). - Item 013 Qty=460.00 of Providing and fixing concertina coil fencing with required dia 600 mm up to 3m height of wall with existing angle iron ‘Y’ shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. stud tied with G.I. staples and G.I. clips to retain horizontal including necessary bolts or G.I. barbed wire tied to angle iron all complete as per direction of Engineer-in-charge with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm. with tape (0.52 mm thick) of Supreme make or equivalent and weight 43.478gm/ meter (cost of M.S. angle, C.C. blocks shall be paid separately). - Item 014 Qty=1380.00 of White washing with lime to give an even shade: New work (three or more coats). - Item 015 Qty=1230.00 of Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. - Item 016 Qty=15.00 of Erecting steel gate of any size on existing posts. - Item 017 Qty=27254.00 of Providing structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. - Item 018 Qty=460.00 of Laying Brick Flat Soling (75mm thick) including grading the base and spreading 25mm thick sand bed at bottom and grouting soling with cement mortar (prop. 1:3) and carrying all materials from a distance of up to 30.00m. - Item 019 Qty=50140.00 of Supply of Local bricks- First Class. - Item 020 Qty=55 of Supply of Broken stone-Boulder broken (25mm graded down to 12mm), hard and clean. - Item 021 Qty=6375.00 of Supply of Timber for shuttering. - Item 022 Qty=127.00 of Supply of Sand for general use with normal moisture content to be clean and free from clay rubbish. - Item 023 Qty=35.00 of Supply of Jhama bricks bats-each bat not smaller then 1/3 of a full brick. - Item 024 Qty=33.00 of Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials : Beyond 4KM and Up to 5KM. - Item 025 Qty=165 of Extra on Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials on every additional KM: Beyond 5KM and Up to 10KM. - Item 026 Qty=2300.00 of Leveling and dressing road sides and verges including dressing the area and cutting earth up to 150mm depth and filling depression and breaking large earth lumps as directed. - Item 027 Qty=443 of Collecting / excavating sand, soil, silt, ordinary earth from any source, load into lorries, transport it to distant place of work including procuring earth and laying in layer of 150mm thickness and compacting, profile properly made for taking measurement, including all measurable lead up to 30m and lift as required. (The contractor shall be responsible for all formalities of supply of earth such as purchase of land including royalties, monopoly / other statutory taxes as required from any distance.) - Item 028 Qty=552.00 of Laying Brick Flat Soling (75mm thick) including grading the base and spreading 25mm thick sand bed at bottom and grouting soling with cement mortar (prop. 1:3) and carrying all materials from a distance of up to 30.00m. - Item 029 Qty=552.00 of 15mm cement plaster on rough side of single or half brick wall of mix:1:4 (1 cement : 4 coarse sand). - Item 030 Qty=39.00 of Supply of Sand for general use with normal moisture content to be clean and free from clay rubbish. - Item 031 Qty=42.00 of Supply of Jhama bricks bats-each bat not smaller then 1/3 of a full brick. - Item 032 Qty=10.00 of Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials : Beyond 4KM and Up to 5KM. - Item 033 Qty=50.00 of Extra on Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials on every additional KM: Beyond 5KM and Up to 10KM. |
Bid Bond | INR 25,500.00 |
Offer Validity | 90 days |