Reference | BID916435 |
Date | 3/13/2019 |
Location | Africa |
Scope | The company announces its need for Installation of Thermal Fluid Heaters Inside Tanks of Asphalt Plant. Carry out all activities for installation of thermal heaters (supplied by Babcock Wanson, UK and presenly availabe in the warehouse at Benghazi asphalt plant) for the following storage tanks at Benghazi asphat plant: TK-101A Reduced Crude. TK-101B Reduced Crude. TK- 103 VGO. TK-105 Asphalt Tank. The scope of work shall include but not limited to: - Supply of materials such as piping, electrical power and instrument cables, fittings, material for concrete foundation, pipe sleepers etc. - Installation works such as civil, mechanical, electrical and instrumentation. - Inspection, testing, commissioning and startup of the heaters. - Onsite training for the Owner’s operation and maintenance personnel. |