Reference | 063/SC/19 |
Date | 9/2/2019 |
Location | Middle East |
Scope | The company announces its need for Major Maintenance for Unit 927 & 929 of GPS. The Scope of Work include but not be limited as below: - Conduct investigation or survey before stating Work if necessary. - Provide all of the equipment,materials, and the tools for use in the Work. - Provide all the temporary facilities to fulfill the work. - Isolate the processing system of the equipment. - Carry out the cleaning, inspection,repair or replace, painting for both internal and external surface, internal accessories if necessary. - The bundles, tube sheets, internal floating heads shall be cleaned and tested if possible. - Clean or replace the Pall ring and other stuffing for towers as required. - Clean or replace the equipment accessories such as mist eliminator, filter elements, Pall ring,tray, float valve , activated carbon etc. - Replace the cooling water inlet pipeline of lean amine cooler E-92710. - Clean the radiators of air coolers. - Clean and purge (including nitro genre placement) the equipment and pipelines, including nozzles and floating ball for level gauges, nozzles and regulation valves, etc. Control valve pipelines to be cleaned - Install drainage pipeline from refrigerator unit wet gas outlet to closed drain drum. - Pressure test or tightness test for all vessels, towers, heat exchangers, reboilers and coolers after maintenance, all equipment, tools, consumables and nitrogen trucks are in Contractor’s scope of work. - Provide necessary scaffolding support for Company team to execute the inspection and detection. - Provide 72 hours running test. |
Bid Bond | US 12,000.00 |
Documents Price | US 100.00 |