Reference | HFY-PUR/F&C1012-0999 |
Date | 7/18/2019 |
Location | Middle East |
Scope | The company announces for purchasing 3x9mw Medium Heaters. Project Scope of work includes Design, HAZOP study, material selection, procurement, fabrication, assembly, Third Party Inspection, testing, FAT, painting, shipment, SAT, Site Service for new heat medium system package. - 3 sets of Heat Medium Heater including burner system, exhaust stack; - 4 sets of Circulation Pumps; - 1 set of Local control cabin - 3 sets of Fuel Gas Treatment skid; - Heat Medium package auxiliaries including make-up pumps and common filter, heat medium accumulator, heat medium storage tank, All interconnecting piping with supports, Valves, devices, instruments, All interconnecting cables and cable tray; etc.; - First filling of Heat Medium Oil. |
Documents Price | US 100.00 |