Reference | OGC/RFQ/18/7700001375 |
Date | 8/29/2019 |
Location | Middle East |
Scope | The company announces its need for supply of Fire Fighting System at Fahud. Scope of Works: 1- Dismantle removal of existing, fire pump. 2- Supply of new Fire Pump Set - 50 GPM @ 5 BAR ( 1 No Electric + 1 No Diesel) , With all accessories, UL/FM Approved - NAFFCO. 3- Fire Pump room valves for the above fire pump. 4- Installation of fire pump set. Providing concrete foundation for fire pump set as per site requirement. 6- Providing necessary roofing using GI Sheet for fire pump at roof top. 7- Lifting positioning the fire pump to roof top. 8- Transportation handling charges. 9- Testing Commissioning of fire pump. Contractor should provide proper lifting and installation procedures to be reviewed before installation. |