Engineering Study for Rehabilitation of Field Instrumentation and Control System
Engineering
Reference MTC-41/2019
Date 9/11/2019
Location Africa
Scope The company announces its need for Engineering study for rehabilitation of field instrumentation and control system (Tobruk and Sarir refineries)- Project No: O-76.

The instrumentation at Tobruk & Sarir Refinery is mostly pneumatic control system; the existing system is absolute and unreliable. Spare parts for existing equipment are difficult to obtain.

Objective:
- Replacing the existing analogue instrument system to digital instrument system.
- Implemented modern DCS capable to operate the plant within accuracy limits and in safe conditions.
- Possibility to use wireless digital instruments.
- Possibility to use P/I convectors.

Bidding Information

Bid Bond 0.5% of the submitted proposal value
Bond Validity 60 days
Engineering
Related Prooducts: Engineering Consultants Engineering General Maintenance and Repair Production Engineering Project & Resource Management Training & Education
Related Tenders: Consultancy Engineering FEED General Maintenance and Repair Process Technology Licensing Production Engineering Project & Resource Management