Reference | MTC-35/2019 |
Date | 9/11/2019 |
Location | Africa |
Scope | The company announces its need for Replace transformers for CP’s and oil wells at GOSP5 & GOSP6. Description: - Supply and install 2MVA, 34.5/11KV power transformer at GOSP6. - Supply and install 2MVA, 34.5/11KV power transformer at GOSP5 ( transformer available at site). - Design, supply & install (3) substations with accessories, one 36 KV and two 12 KV at GOSP 5 & 6. - Design, supply & install fire detection & firefighting system for the substations and transformers. - Design, supply & install required cables with accessories Design and install all civil works for substations, transformers ……….etc. - Perform all the required test and commissioning. - Disconnect the old equipment and transported to warehouse yard. |
Bid Bond | 0.5% of the submitted proposal value |
Bond Validity | 60 days |