Reference | HFY-CON/F&C1062-1085 |
Date | 10/24/2019 |
Location | Middle East |
Scope | The company announces its need for supply of and Provision of Engineering, Procurement, Construction and Commissioning of the CPF1 Oil Treatment System Upgrading. The main scope of work includes Engineering, Materials Procurement, Construction and Installation, commissioning and warranty for: 1. CPF1 Oil Treatment System Upgrade: - CPF1 Crude Oil Treatment System Upgrade mainly including 2 units of Medium-Oil Heat Exchangers; 3 units of 2nd Stage Separators; 2 units of Oil-Water Heat Exchangers; 1 unit of On-Spec Gas Boot; 3 units of Heat Medium Heaters (supplied by COMPANY). 4 units of Chemical Injection Skids, etc. - HP Gas Inlet Separator for existing HP Gas Compressor. - LP Flare K.O. Drum Pumps for Existing Flare K.O Drums. - CPF1 Power Plant Fuel Gas Supply System Upgrade to improve existing Power Plant adaptability including one Inlet gas separator, three fuel gas electrical heaters and two condensate electrical heaters. - CPF2 Pig Launcher and HPS Pig Receiver, will be added for CPF2-HPS oil transfer pipeline, to achieve pigging operation. - Utilities Upgrade, includes Fresh Water Treatment System, Water Softening Skid, Firefighting System etc. - Auxiliary System Upgrade, such as Power Supply System, Instrument and Control System, Telecommunication System, and etc. - Civil and structural work included East Substation, Equipment foundations & shelters, Pipe Rack and support. - Corrosion Monitoring System upgrade. - Demolition and Reinstallation Work. - Operational Improvement Works for existing facilities. 2. Gas Export Pipeline Re-routing: - Re-route of the existing Gas Export Pipeline and Condensate Pipeline. - Add Block Valve Station in Gas Export Pipeline |
Documents Price | US 500.00 |