Reference | 101/SC/19 |
Date | 11/11/2019 |
Location | Middle East |
Scope | The company announces its need for supply of Maintenance of WS2 POOLS. The Scope of Work including but not limited in: - Isolate the inlet and discharge pipeline. - Drain and remove sludge from Rapid filter pool A/B/C/D/E/F, Reactor Settler Tank A/B, Waste Water Recycling pool, and Grid Removal pool A/B. - Replace the filter media and filter nozzles for Rapid filter pool A/B/C/D/E/F. - Provide the filter plate to replace the damaged one for Rapid filter pool A/B/C/D/E/F. - Remove old Quartz Sand and clean up the sludge for all of the pool. - Maintenance of the drain valve for Reactor Settler Tank A/B and Grid Removal pool A/B - Maintenance of liquid level meter and turbidity meter if required. - Anti-corrosion of protective fence of Rapid filter pool A/B/C/D/E/F, Reactor Settler Tank A/B, Waste Water Recycling pool, and Grid Removal pool A/B - All the material except valves is provided by contractor. - Clean up the waste materials in the construction site and restore the original appearance of the construction site. |
Bid Bond | US 5,000.00 |
Documents Price | US 100.00 |