Reference | 023/SO/19 |
Date | 12/22/2019 |
Location | Middle East |
Scope | The company announces its need for Renovation Service for Vacuum Deoxygenating Tower B. The engineering, procurement, construction and commissioning related to Vacuum Deoxygenating Tower B Renovation are all within the Contractor’s scope. And mainly include the following items: 1) Add connection line form Vacuum Deoxygenating Tower B (T-04110B) to Tower Bottom Pump B (T-04140B) directly with related isolation valves. 2) Add connection line from Water Injection Feed Pump A (P-04520A) to Water Injection Feed Pump B (P-04520B), both suction piping and discharge piping. 3) Add connection line from Tower Bottom Pump B (P-04140B) discharge piping to Tower Bottom Pump A (P-04140A) discharge piping. |
Documents Price | US 100.00 |