Reference | IN/Tatweer/335/2020 |
Date | 1/13/2020 |
Location | Middle East |
Scope | The company announces its need for supply of Weatherford Spares Required for Field Maintenance. The ordered items are very critical items of Beam Pumping unit and without this items the BPU cannot put in operation. The function of load cell to showing the load in graphic display of POC and Pump off controller require for assembly of new BPU or refurbishment of new BPU, either failure of internal circuit it require to replace. |
Bid Bond | BD 500.00 |
Bond Validity | 180 days |
Documents Price | BD 15.00 |