| Reference | KPC/KPRL/PU/OT/020.002/2019-2020 |
| Date | 1/29/2020 |
| Location | Africa |
| Scope | Excavation, Exposure and Insulation of The 18 Inch Crude Pipeline from KPRL Changamwe to Port Reitz. |
| Bid Bond | KES 200,000.00 |
| Bond Validity | 180 days |
| Offer Validity | 150 days |