Reference | GT20101100 |
Date | 2/3/2020 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for centralized waste water and sewage treatment plant at halul. The scope of work covers the Engineering, Procurement, Construction and Commissioning (EPIC) for the New CWWTP at Halul Island. The proposed Facility shall consist of the following: 1- Network of sewer lines collecting grey and black water from existing facilities on Halul through a series of manholes and lifting stations to the new Centralized Waste water and Sewage Treatment Plant. 2- New Centralized Waste water and Sewage Treatment Plant. The Facility will comprise of main Facility Building and all equipment associated with waste water treatment. Vehicular access shall be provided to all areas of the Facility. Open car parking shall be provided for three (3) numbers of cars. 3- New pumps and rising mains to send treated waste water from the WWTP to existing irrigation tanks. Replacement of one existing irrigation tank for a new larger irrigation tank. 4- Lifting Stations for pumping collected waste water to higher locations. 5- Conversion of an existing holding / septic tank to receive septic sewage by vacuum trucks. Associated new pumps and piping to transfer septic sewage into a new lifting station. 6- All required utilities for the Facility. |
Bid Bond | QR 1,500,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |