Reference | GT20101200 |
Date | 3/4/2020 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for EPIC for groundwater drainage system in mesaieed (phase 2). The objective of the Phase 2 Groundwater Drainage Project for Mesaieed is to reduce and limit all groundwater increases in Mesaieed Industrial (Secure Area) and reduce ground water levels to a minimum level of 1.5m below ground level in order to protect all existing infrastructure and buildings and to enable further development of available land. In addition the project shall comply with any MME regulations, ensure safety, integrity and be provided with minimum maintenance works and ensure protection of the environment. The proposed Project shall include, as a minimum but not limited to, the following: Provision of a system of collection drains, pumping stations, rising mains and outfall structure to enable removal of surface groundwater from the shallow aquifer. Phase 2 EPIC Works for the Surface groundwater drainage system in the MIC Secure Area include: - Three (3) no. New Groundwater Pump stations located within the MIC Secure Area (Phase 2) - A network of perforated groundwater collection drains feeding to the new groundwater pumping stations. - Pressurized rising mains from each groundwater pumping station conveying groundwater to the associated terminal pumping station (GW-PS4) and connection to the new outfall pipeline constructed under Phase 1 Works. - Provision of Fiber Optic to connect to existing systems for the collection of control data for the proposed facilities and transfer of operational data only. |
Bid Bond | QR 3,000,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QR 500.00 |