Reference | 951 |
Date | 3/3/2020 |
Location | Africa |
Scope | The company announces its need for Provision for developing the entrance of the company’s industrial safety and security in Tajura. The company intends to establish a building with a roofed area of approximately 140 square meters, at the site of Tajura for the purpose of guarding and preserving the company’s property where the building includes (concierge / reception / three offices / bathroom / kitchen). The contractor shall prepare the site and provide the proposed requirements according to a detailed engineering study showing the details and specifications of the implementation materials. The Contractor shall submit detailed reports and studies including all drawings, quantities and specifications for the preparation, execution, extensions and any proposed additions that do not harm the facilities in any way, for review and approval before commencing its implementation; the works include but not limited to the following:- • Review drawings, assay and site survey to identify problems and propose solutions according to needs. • Perform all necessary tests. • Prepare engineering studies including designs, executive drawings, specifications, quantities and prices for all required works. • Prepare the timetable for the duration of the project implementation. • Delivery method of implementation (METHOD OF STATEMENT). • Preparation and transfer to public dumps. • Supply and transport the necessary materials to the site. • Adoption of samples before all building, electrical, ventilation, etc. works. • The implementing contractor shall abide by all the engineering specifications approved by the company at all stages of the completion of the project, from the engineering designs through the selection and purchase of the necessary materials to the completion of the installation and final tests. |