Complete the Installation and Operation of Waste Incinerator
Waste Water Treatment Plant
Reference 950
Date 3/3/2020
Location Africa
Scope The company announces its need for Complete the Installation and Operation of Waste Incinerator in the Field of A-100.

The company intends to search for suitable contractors with extensive experience in the field of supplying and installing waste incinerators capable of completing a previous project that was not been completed in the field of Abu-atifel (A-100) by instating a waste incinerator on the concrete surfaces on sits with provision of spare parts and expired materials and materials where there is damage due to environmental factors.

The model is BMWR-300 and has a burning capacity of 300 kg per hour.

The scope of work includes, for example, the following list of activities:
1- Cleaning the area of sand that was deposited due to weather conditions.
2 – Supply and installation of all the necessary equipment for the gas pipeline and connect the line with a diameter of one and a half inches with a burner.
3 – Completing the supply of water such as pipes and reservoirs.
4 – Connect the power cable to the switchboard provided by ABB.
5 – The contractor shall provide all the materials lost from the original factory or similar.

Bidding Information

Waste Water Treatment Plant
Related Prooducts: Waste Water Treatment Plant General
Related Tenders: General

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.