Reference | MTC-12/2020 |
Date | 3/11/2020 |
Location | Africa |
Scope | The company announces its need for Modernization of metering devices and the tank level gauging system at Sarir refinery phase No-2 Project No- I-81. The contractor shall procure all materials, and equipment, perform all works (supply and install) and shall commission & hand over the completed project into fully operable ready to use condition and to the satisfaction of the company, according to AGOCO procedure on “TurnKey” basis. The contractor is required to replace completely the old existing metering system (FQI-1, FQI-4, FQI-3) with complete new control loops, meter transmitter FT and FCR. FIC indicator controller and FQR. The contractor is required to install new meters with their control loop i.e. (FE_FT-FIC-FA) for each proposed flare meter and LPG meter. |
Bid Bond | 0.5% of the submitted proposal value |
Bond Validity | 60 days |
Documents Price | LD 3,000.00 |