Reference | MTC-50/2019 |
Date | 3/11/2020 |
Location | Africa |
Scope | The company announces its need for Replace MCC & generator protection & control panels of gas turbines GT1/GT2/GT3/GT4 Messla field. Description: -Removal of the existing LV switchboard, MCC, generator protection & control panels for turbines no GT1, GT2, GT3, and GT4. - Design, supply and install LV switchboard, MCC, generator protection & control panels. - Design, supply and install electrical wires, cables, conduits and fitting, etc. - Perform all the required test and commissioning. Transport the old equipment to warehouse yard. |
Bid Bond | 0.5% of the submitted proposal value |
Bond Validity | 60 days |