Reference | 001/SC/20 |
Date | 3/28/2020 |
Location | Middle East |
Scope | The company announces its need for Existing 17 producers convert to inject water, so pipeline in well site and OGM need to be modified, the new water injection flowline shall be interpenetrated with HDPE. In additional, about 11kmold water flowline shall be modified and be interpenetrated with HDPE. The work loads are deemed to be finished but not limited and guaranteed as below: (1) Tie-in work in OGM and wellhead (17sets). (2) 6” steel WI. flowline construction, commissioning service (29KM). (3) HDPE interpenetration service for6" WI. flowline(include one bend) (40KM). |
Bid Bond | USD 120,000.00 |
Documents Price | US 100.00 |