Reference | IN/Tatweer/488/2020 |
Date | 4/5/2020 |
Location | Middle East |
Scope | The company announces its need for Supply of Pressure Transmitter at Beam pump units (BPU) discharge flow line. The BPU is supplied by Lufkin. The newly installed PT is connected to Lufkin Pump Off Controller (POC) and configured to trip the BPU at predefined value read by pressure transmitter. |
Bid Bond | BD 500.00 |
Offer Validity | 180 days |
Documents Price | BD 15.00 |