Reference | IN/Tatweer/484/2020 |
Date | 4/5/2020 |
Location | Middle East |
Scope | The company announces its need for Supply of Temperature Transmitter. Field operation team requesting to install temperature transmitter on reboiler vapor line at K1 to K24 GDUs. The temperature of vapor line (3" and 4`) s very important for the GDU, it indicates the dehydration efficiency in the glycol circulation and thus can give a preliminary indication to the quality of the gas to customers. |
Bid Bond | BD 500.00 |
Offer Validity | 180 days |
Documents Price | BD 15.00 |