Reference | HFY-CON/F&C1089-1112 |
Date | 5/11/2020 |
Location | Middle East |
Scope | The company announces its need for Provision of EPCC of Source Water Wells Tie-In in Y2020. The main scope of work for the project includes a detail engineering, site geotechnical survey, material procurement, construction, commissioning for: 1) 13 sets source water wellhead facilities; 2) 4 sets water gathering manifold station; 3) 1 set Manifold and valve group in WIBS 2; 4) About 14km 6” GRE flow lines & 6.7km 8” GRE flow lines & 12.3km 12” GRE flow lines; 5) 6" & 8" & 12" GRE pipe crossing; 6) Related Civil & Structure, Instrument & Control, Electrical and etc. 7) Reserved point for desander in wellhead, reserved valves for transfer source water & oxygen scavenger injector in WIBS2. |
Documents Price | US 100.00 |