Reference | MTC-15/2020 |
Date | 6/7/2020 |
Location | Africa |
Scope | The company announces its need for Replacement and supply new of two Desalters at GC-1, Sarir oil field project No: P-24. The contractor shall perform site survey to collect and verify the necessary data, information and suggestion from the company and shall produce the Engineering package based on its own survey result/ data collection and calculation. The contractor shall dismantle/ remove Desalter 1 and 2 shall transfer to the company designated storage area. The contractor shall dismantle/ remove existing foundation and design and construct the new foundation as per applicable codes and standards. The contractor shall install the new Desalters and shall align with the existing facilities. The contractor shall establish all tie-ins and connect points to existing facilities. All sample points, sight glass gauges, drains or any instrument drains shall be connected to the drain pit. |
Bid Bond | 0.5% of the submitted proposal value |
Bond Validity | 60 days |
Documents Price | LD 6,000.00 |