Reference | PRQ/774/MCX/20 |
Date | 7/7/2020 |
Location | Africa |
Scope | The company announces its need for Replacement & Installation of MDEA Regenerator Column (52-581-VJ01) in SRU Train II (J2) Area at Mellitah Complex. The scope of work is to replace MDEA Regenerator Column (52-581-VJ01) in Sulphur Recovery Unit Train II (J2) Area at Mellitah Complex and install a new one that purchased by Company, the required work shall include but not limited to the following:- 1- The contractor shall conduct site survey to determine the following:- - Required quantity and type of equipments for required lifting - Define the needed number of manpower in accordance with the scope of work prepared for this project. 2- The contractor shall provide required heavy equipments such as (cranes, forklifts, etc …) to carry out the dismantling and installation of new MDEA regenerator column in professional way. 3- The contractor shall provide skilled manpower to perform work safely. 4- Provision of all logistics to support contractor team at site such as (accommodation, food, transportation, etc…) 5- HSE procedures should be observed in implementation of the work. |