Reference | 9 /2012 |
Date | 7/13/2020 |
Location | Middle East |
Scope | The company announces its need for Replacement of the control, monitoring & alarm system for turbine compressors K1 A,B in plat forming unit /500/ on turn key basis. Objective : replacement the existing control,monitoring, alarm, and emergency shutdown system package by a new one to each compressor K1 A,B. 1- Preface: 1-1 compressor/turbine package information: Manufacturer: CANTIERI NAVALI RIUNITI GENOVA RIVA TRIGOSO WORK SHOP FIRST COMPRESSOR SYRIAL NUMBER : R.9275 A SECOND COMPRESSOR SYRIAL NUMBER : R.9275 B YEAR : 1983 BACK PRESSURE STEAM TURBINE TYPE : MSVS PERFORMANCE CONDITIONS : RATED POWER : KW 1272 RATED SPEED : RPM 10652 MAXIMUM CONTINUOS SPEED : RPM 11184 OVER SPEED TRIP : RPM 12303 FIRST CRITICAL SPEED : RPM 4600 STEAM INLET PRESSURE (NORM/MAX): Kg/cm² ABS 38/42 STEAM INLET TEMPERATURE (NORM/MAX ): (450/500) C°. STEAM EXHUST PRESURE(NORM/MAX): (4/4.58) Kg/cm² ABS 1-2 Local cabinet package information: Manufacturer: CONTROL MATIC SYSTEM VIA PIETRO DALISSONE 20035 LISSONE. EEXp II T3 PANEL TYPE: QP-1 YEAR: 1983 POWER SUPPLY: 2.2 KW VOLTAGE : 110 / 220 AMPER: 10 / 20 FREQUNCY: 50 – 60 HZ PURGING TIME: 22 MINUTE 1-3 Pently Nevada package for each compressor consist of : POWER SUPLY TYPE: 7200 (base no: 4091U) TURBINE TACHOMETER MONITOR: 7200(base no: 4093U) TURBINE AXIAL DISPLACEMENT: 7200 (base no: 4093 U) TURBINE VIBRATION COPLING END: 7200 (base no: 4093U) TURBINE VIBRATION NON COPLING END: 7200 (base no:4093U) |
Bid Bond | SYP 103,075,000.00 |
Offer Validity | 150 days |
Documents Price | SYP 1,500.00 |