Reference | 049/PC/19 RE |
Date | 8/27/2020 |
Location | Middle East |
Scope | The company announces its need for supply of Instrument for FSF Major Maintenance. - Item 001, QTY=1 PC of Electric pressure regulating valve, ROTORK. - Item 002, QTY=2 PC of Electric level regulating valve,ROTORK. - Item 003, QTY=30 ST of Pressure Transformer, Rosemount. - Item 004, QTY=10 ST of Electromagnetic Flowmeter, Rosemount. - Item 005, QTY=20 PC of Display Module for Electromagnetic Flowmeter, Rosemount. - Item 006, QTY=10 PC of CPU module with control program, BEIJING ECHO TECHNOLOGIES CO.,LTD. - Item 007, QTY=10 PC of control modul,BEIJING ECHO TECHNOLOGIES CO.,LTD. - Item 008, QTY=10 ST of Photoelectric assembly, BEIJING ECHO TECHNOLOGIES CO.,LTD. - Item 009, QTY=10 ST of Switching power supply, BEIJING ECHO TECHNOLOGIES CO.,LTD. - Item 010, QTY=10 ST of Radar Liquid Level Transmitter, Tianjin Beite Instrument technology Co.,Ltd. - Item 011, QTY=8 Pc of keyboard with program, BEIJING ECHO TECHNOLOGIES CO.,LTD. - Item 012, QTY=5 PC of CPU for Mass Flowmeter, Emerson. - Item 013, QTY=1 PC of Mass flow meter, Emerson. |
Bid Bond | US 8,000.00 |
Documents Price | US 100.00 |