Reference | PRQ/777/GP/20 |
Date | 8/27/2020 |
Location | Africa |
Scope | The company announces its need for NC118 Development Project Feasibility Techno-Economic Study. The scope of work is to perform the feasibility (Techno-Economic) study for the development of NC118, the required work shall include but not limited to the following options:- 1- To develop Stand-alone EPF (Early Production Facilities) connected to the existing Wafa-Mellitah Liquids P/L. 2- Synergy with Nafusah Oil Operations in Area 47 which is need to be studied and evaluated. Contractor who will provide comparative economics analyses details of each option such as discounted cash flow analyses and shall produce relevant economic indicators. |