Scope |
The company invites all prospective suppliers and contractors for Study Assessment Repair/Replace Culverts DCA.
This study aims to carry out detailed structural assessments of 83 culverts within the DCA area that have been identified as being in deteriorated condition. The objective is to conduct site surveys and condition surveys, conduct field sample tests, analyze, evaluate and interpret the results, conclude findings and prepare recommendations based on the outcome of these findings. Each culvert shall be assessed and recommendations shall be made where culverts are required to be repaired or replaced. The most suitable repair or replacement method shall be recommended. Recommendations shall be outlined in an assessment report that shall also include a techno-economic analysis of all options. Culverts shall be categorized depending on the condition of the culvert as surveyed and based on the recommended course of action.
|