Reference | TPC-1242-2020 |
Date | 10/26/2020 |
Location | Middle East |
Scope | The company announces its need for Supply of WTP Treated Water Tank Anodes. The requested Treated Water Tank (Tag: WTP-01-T-1001) is installed in the produced water treatment facility 1 to 6. This facility has been built in the year 2012 for the separation of water which comes along with the Oil and Gas from the wells. The WTP processes, these produced fluids and treat it both for disposal as well as for water injection to the wells. |
Bid Bond | BD 500.00 |
Bond Validity | 180 days |
Documents Price | BD 15.00 |