Reference | GT20107100 |
Date | 12/24/2020 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors to install a produced water collection system including Produced Water Collection Tank (PWCT), PWCT pumps and associated pipework to eliminate the disposal of the produced water from storage tanks at KMDS, FMDS and JDS into the aquifer. Water collected in the PWCT shall be transferred to the new Produced Water Secondary Treatment (PWST) inlet through an existing tie-in valve near degassing vessels for reinjection. The Scope of Work is including the following main items for each of the three main degassing stations, Khatiyah Main Degassing Station (KMDS), Fahahil Main Degassing Station (FMDS) and Jaleha Degassing Station (JDS): 1. Provision of one (1) no. PWCT installed in concrete pit back filled with sand. 2. Three (3) nos. vertical submersible PWCT pumps 3. All associated Produced Water (PW) collection pipework from storage tanks to the PWCT and PWCT to the designated tie-in point at inlet of the PWST. 4. Provision of blanketing gas, vent and utility pipework as required. 5. All associated electrical, instrumentation and civil works. |
Bid Bond | QR 1,000,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QR 500.00 |