Reference | HFY-CON/F&C1114-1137 |
Date | 12/28/2020 |
Location | Middle East |
Scope | The company announces its need for Source Water Wells Tie ins (Y2021 - Y2022). Contractor shall complete the following work, while detail design and major materials e.g. GRE pipes, DSS wellhead modules shall be supplied by company: 1) 6”/8”/12”/20” GRE pipelines construction, including crossing of river, road and existing facilities. 2) Source water well head facilities installation and tie-ins. 3) Water gathering manifolds installation and tie-ins. 4) 20” GRE Pipeline tie-ins in each Water Injection Booster Station (WIBS). 5) Commissioning and warranty. 6) LLI vendor’s technical support for construction and commissioning. val7) Other works related to completion of the project. |
Documents Price | US 100.00 |