Egypt Zones accountACCOUNT
EPIC for Replacement of Refinery Pipeline Culverts in MIC
Pipe Lines Installations
Reference GT20105800
Date 12/28/2020
Location Middle East
Scope The company invites all prospective suppliers and contractors for EPIC for Replacement of Refinery Pipeline Culverts in MIC. The scope of Work for the EPIC Works is as summarized below:
1. EPIC of New Culverts EPIC of eight (08) new RCC culverts to replace the existing culverts which are in a poor state of repair shall be provided according to the changed site & loading conditions, applicable local and international codes/ standards and QP/ Shell DEPs. Topographic and geotechnical investigation will be required at these locations. Alignment of culverts will remain the same. Particular attention shall be given in the design and construction to prevent ground water ingress into the culverts.
2. Protection of existing pipelines inside Culverts. As the pipe lines services cannot be disrupted, the existing pipelines shall be properly protected/ secured prior to and during the demolition of existing culverts and construction of new culverts.
3. Demolition of Existing Culverts & Asphalt Road Overlay The culverts are located under busy MIC roads, hence the re-construction of these culverts should be carried out in phases with close coordination with MIC to ensure continuous traffic flow with minimum disruptions. Demolition of existing shall be undertaken to ensure no loss of service of any pipelines and be undertaken in line with highest health and safety standards. The reconstruction of culverts shall require construction of temporary roads for traffic diversions, open cutting of existing asphalt roads, and demolition of existing culverts. Traffic management including all safety barriers and warnings shall be provided during the demolition and re-construction culverts.
4. New Culverts Construction The construction of eight (08) new culverts shall comply with the current standards / codes, changed site conditions and QP safety requirements. Dewatering works will also be involved throughout the demolition and construction. Construction on new culverts shall be undertaken to ensure no loss of service of any pipelines and be undertaken in line with highest health and safety standards.
5. Reinstatement of Asphalt Road Overlay Reinstatement of asphalt road to be done as per MIC specifications and referenced standards.

Bidding Information

Bid Bond QR 900,000.00
Bond Validity 150 days
Offer Validity 120 days
Documents Price QR 500.00
Pipe Lines Installations
Related Prooducts: Pipe Lines Installations Civil Works Civil Works - General Construction Contractors Electrical Engineering Procurement and Construction (EPC) General Installations for water/waste water plants Mechanical Pipe Lines Installations Pumping Stations Steel Works
Related Tenders: Civil Works Civil Works - Finishing works Construction Contractors Electrical Works Engineering Procurement and Construction (EPC) Engineering Procurement and Construction Management (EPCM) General Mechanical Works Pipe Lines Installations Steel Works

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.