Reference | GT21101900 |
Date | 3/25/2021 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for EPIC for Upgrade of Main Power Generation Units at NFA. IMPROVEMENTS PROJECTS FOR SIEMENS POWER GENERATORS PACKAGE (SGT-A20) AT NFA: To implement various Projects on the MPG Package either due to obsolence or Operatioanl requirements i. Supply and installation of new modified Lube and Hydraulic Oil Consoles with controls for MPG A and B. (The existing Lube and Hydraulic Oil Consoles of the two (2) MPGs are obsolete and the OEM (Siemens) no longer supplies replacement parts) ii. Supply and installation of the liquid fuel forwarding skid. The upgraded diesel fuel skid is a single line fuel forwarding system due to obsolence. iii) Diesel Fuel circulations system to avoid stagancy of fuel. iv) PT sealing Air Project, to reduce chances of internal oil leak, leading to Fire within the package (safety related project) v) PT vent mod (safety related project) |
Bid Bond | QR 300,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |