Reference | MTC-05/2021 |
Date | 3/15/2021 |
Location | Africa |
Scope | The company announces its need for Replacement of 10.5kv BBC substations S/S 50/10, 60/10 and S/S 3.3kv old heater dewaxing plant at Tobruk Terminal Project No-O-89. Description: - Design, supply and install 12kv metalclad switchgear panel substation for BBC 50/10 & BBC 60/10 with accessories - Remove existing TR501 2MVA Transformer and install, connect new transformer 6 MVA is available on sit and construction concrete foundation. - Contractor shall supply and install one (1) unit power transformer 160KVA,10.5/0.415 kv, DYN5, 50HZ - Design, supply and install 3.3kv metalclad switchgear for BBC 60/10 & old heater dewaxing plant 3.3kv S/S with accessories - Supply and install SCADA system for substations BBC 50/10 BBC 60/10 - Design, supply and install required cables with accessories - Make all necessary civil work repair & modify substations buildings - Design, supply and install firefighting system for the substations - Disconnect old substations equipment and transported to warehouse yard |
Bid Bond | 0.5% of bid price |
Bond Validity | 60 days |