Egypt Zones accountACCOUNT
Purchase of Electrical Spares for Phase III Power Plant and Substations.
SCADA Systems
Reference HFY-PUR/PD1105-1092
Date 3/16/2021
Location Middle East
Scope The company announces its need for supply spare parts for various electrical equipment and switchgears, Power Scada installed in Phase III Power Plant and substations.

Bidding Information

Documents Price US 100.00
SCADA Systems
Related Prooducts: SCADA Systems Analyzers, Gas Calibration Equipment Density Detector, Gas Drilling Instruments Gas meters General Indicators and Recorders Level meters Liquid Measurement Monitoring & Control Pressure gauges/ Transmitters SCADA Systems Temperature gauges/ Transmitters Thermocouples Transmitters Transmitters, Pressure Viscosity Weighing Equipment
Related Tenders: Analyzers, Gas Calibration Equipment Calibrators, Electronic, Pneumatic Conductivity Meters Density Detector, Gas Dissolved Oxygen meters Drilling Instruments Gas meters General Indicators and Recorders Leak Locators Level meters Liquid Measurement Monitoring & Control Mud Logging Pressure gauges/ Transmitters SCADA Systems Temperature gauges/ Transmitters Thermocouples Thermowells Transmitters Transmitters, Pressure Viscosity Weather Station

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.