Reference | TP-728-2021 |
Date | 4/12/2021 |
Location | Middle East |
Scope | The company announces its need for Supply of Shutdown Valve. As part of Project scope, to meet the increase in gas supply demand to both Al Dur Phase 1 & Phase 2 power plants, the capacity of existing gas supply lines from DDP to DMS is required to be enhanced by installing an additional 20” pipeline between DDP and DMS. The subject Shutdown Valves (one each) are required at DDP & DMS for safe shutdown of this pipeline, in case of leak / rupture / emergency scenario. |
Bid Bond | BD 1,000.00 |
Bond Validity | 150 days |
Documents Price | BD 100.00 |