| Reference | TP-695-2020 |
| Date | 3/31/2021 |
| Location | Middle East |
| Scope | The company announces its need for Supply of Flanges and Blind Flanges. "As part of GDN debottlenecking project, the Company, Tatweer Petroleum intends to lay 28/24 inch combination of gas pipelines between Hidd Metering Station (HMS) to Alba Gas Station Jump over (AGS J/O). The subject project scope included connecting pipelines in Al Dar Valve Station (DVS) and Wharf Valve Station (WVS) with new proposed lines". |
| Bid Bond | BD 1,000.00 |
| Bond Validity | 150 days |
| Documents Price | BD 50.00 |