Reference | EE/15268-GM |
Date | 5/9/2021 |
Location | Asia |
Scope | The company announces its need for Design, Supply, Installation, Testing, Commissioning, Operation and Maintenance of PV based Solar Power System of up to 500 KWp Capacity along with Battery Backup of 10 KW Lighting Load for 10 hours on Built-Own-Operate-Transfer (BOOT) basis with Grid Connection under Net Metering Regulations of NEPRA at following PSO Bulk Storage Locations. i. Zulfiqarabad Oil Terminal (Grid Tied System). ii. Mahmoodkot Oil Terminal (Grid Tied System), iii. Machike Oil Terminal (Grid Tied System). iv. Shikarpur Oil Terminal (Stand-Alone System with Provision of Grid Tie). |